Place of Origin
Gujarat, India
Main Raw Material
Virgin Solvents
Application Method
Brush & Spray
Brand Name
JCK COATING INDUSTRIES
Products Name
N.C Topcoat Metallic Lacquer Gold
Coverage
Approx. 6 - 7 sq.mtr/ltr/coat on sanded JCK Primer applied substrate
Drying Time
Surface Dry ~ 15 minutes, Dry to touch time ~ 30 minutes
Feature
Recoating time ~ 1 hour Hard Dry time ~ 8 -12 hours.
Flash Point
(IS 101/1987, Part 1, Sec 6) : below 5°C
Shelf Life
2 Y from the date of manufacture in original tightly closed containers
Function
kept away from direct sunlight and excessive heat.
Available Size
3.5 LTR / 3.785 LTR (1 USG) / 4 LTR
Packaging Description
3.5 Ltr Tin